One purchase leads to recurring revenue.
₩300,000 · one purchase per vehicle, and measurement begins.
₩15,000 · per-vehicle monthly subscription — calculation and reports issued automatically every month.
As integration scales, connect directly to shipper systems (by consultation).
The step that links verified reductions to assets — currently under NDA review.
Enter your fleet and assumptions — see cost and expected return together.
A one-time DTG purchase plus a monthly Cloud subscription, multiplied at verified unit prices — a calculated figure, no discounts applied. Not just cost — you also see the expected return from the green- and safe-transport new business that measured, standards-grade infrastructure opens up.
Cost is only half the picture. Measured infrastructure returns as a green-transport (GX) premium and a safe-transport (AX) premium / insurance savings. Change the assumptions below to your own numbers.
These figures are a scenario based on assumptions you enter — not our ROI claim. Actual results are proven by sealed measured data (record_hash · score_hash).
* Calculated by multiplying verified unit prices (DTG ₩300,000 per vehicle, one-time · Cloud ₩15,000 per vehicle, monthly). Actual terms depend on deployment scale and integration scope. LCS API involves many usage and integration variables and is priced by separate consultation.
The 90-day PoC — five stages.
The 90-day PoC isn't a technology trial — it's the process that lets you decide on expansion with numbers.
- Define KPIs
- Select representative routes & vehicles
- Document data requirements
- Mount Carbon DTG units
- Check connectivity, power & sensors
- Test real-time collection
- Collect & monitor live operations
- Validate & calibrate data quality
- Match data to shipments
- ISO 14083 calculation & verification
- Generate per-shipment reports
- Map to shipper formats
- Comprehensive KPI review
- Propose expansion fleet & schedule
